CH 13 FAS 1221 over GREEN RIVER

5.0 MI NW GENESEO · County 073, Illinois · Built 1975 · 2 Lanes · 550 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
037321900000000
Year Built
1975
Length
71.3 m (233.9 ft)
Max Span
23.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
550
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.