I295 I55 RAMPS over SEWAGE DISPOSAL RD
.16M N OF JOLIET RD · County 031, Illinois · Built 1958 · 6 Lanes · 39,900 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.765744, -87.908125
This bridge is in worse condition than 62.9% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 68 years old.
Nearby Bridges
NB I-294 over Flagg Creek
Built 2023
SB I-294 over Flagg Creek
Built 2021
NB Ramp A over I-294
Built 2022
I-294 RAMPS I-55 over JOLIET RD
Built 2002
JOLIET RD over FLAG CREEK
Built 1959
I-294 NB over JOLIET RD
Built 1958
I-294 SB over JOLIET RD
Built 1958
I- 55 WB over JOLIET RD EB
Built 1962
I-294 RAMPS I-55 over I- 55 STEVENSON
Built 2002
I-294 over STREAM
Built 1958
Bridge Details
- Structure #
- 016999400000000
- Year Built
- 1958
- Length
- 10.1 m (33.1 ft)
- Max Span
- 10.1 m
- Width
- 29.3 m (96.1 ft)
- Lanes
- 6
- Daily Traffic
- 39,900
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.