I- 55 WB over JOLIET RD EB

2.1 M SW US 45 · County 031, Illinois · Built 1962 · 3 Lanes · 62,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
016000100000000
Year Built
1962
Reconstructed
1996
Length
84 m (275.6 ft)
Max Span
28.2 m
Width
19.3 m (63.3 ft)
Lanes
3
Daily Traffic
62,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.