I-294 SB over JOLIET RD

0.4 M NW I55 P10 · County 031, Illinois · Built 1958 · 3 Lanes · 63,750 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
016981700000000
Year Built
1958
Length
21.9 m (71.9 ft)
Max Span
21 m
Width
18.6 m (61 ft)
Lanes
3
Daily Traffic
63,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.