I-294 NB over ILL 58 (GOLF RD)
1 M N US 14 P11 · County 031, Illinois · Built 1958 · 3 Lanes · 74,050 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
42.053558, -87.868669
This bridge is in worse condition than 17% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 68 years old.
Nearby Bridges
I-294 SB over ILL 58 (GOLF RD)
Built 1958
TRI-STATE294 over Golf Road
Built 1999
I-294 over DRAINAGE DITCH
Built 1959
I-294 SB over BALLARD RD
Built 1958
I-294 NB over BALLARD RD
Built 1958
I-294 SB over C&NW RR
Built 1958
I-294 NB over C&NW RR
Built 1958
BALLARD RD over CREEK
Built 2022
RAND RD over DES PLAINES RIVER
Built 1928
I-294 SB over CENTRAL RD
Built 1958
Bridge Details
- Structure #
- 016975300000000
- Year Built
- 1958
- Length
- 21.9 m (71.9 ft)
- Max Span
- 20.7 m
- Width
- 20.9 m (68.6 ft)
- Lanes
- 3
- Daily Traffic
- 74,050
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $434,000
- Total Project Cost
- $651,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.