I-294 NB over BALLARD RD

0.3 M N US 14 P11 · County 031, Illinois · Built 1958 · 3 Lanes · 66,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
016975600000000
Year Built
1958
Length
26.2 m (86 ft)
Max Span
25 m
Width
18.6 m (61 ft)
Lanes
3
Daily Traffic
66,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$462,000
Total Project Cost
$693,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.