RAND RD over DES PLAINES RIVER
0.5 M NW DEMPSTER RD · County 031, Illinois · Built 1928 · 4 Lanes · 25,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
3
Serious
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 3 | Serious |
| Substructure | 6 | Satisfactory |
Location
42.044967, -87.879433
This bridge is in worse condition than 95.1% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 98 years old.
Nearby Bridges
US 14 (MINER ST) over DES PLAINES RIVER
Built 1925
I-294 SB over BALLARD RD
Built 1958
I-294 NB over BALLARD RD
Built 1958
BUSSE HIGHWAY over PRAIRE CREEK
Built 1930
I-294 SB over US 14 (DEMPSTER ST)
Built 1958
I-294 NB over US 14 (DEMPSTER ST)
Built 1958
NORTHWEST HWY (RAN over CREEK
Built 1957
BALLARD RD over CREEK
Built 2022
US 14 (DEMPSTER ST over CREEK
Built 1928
IL 58 over DES PLAINES RIVER
Built 2004
Bridge Details
- Structure #
- 016036200000000
- Year Built
- 1928
- Length
- 49.1 m (161.1 ft)
- Max Span
- 15.8 m
- Width
- 17.4 m (57.1 ft)
- Lanes
- 4
- Daily Traffic
- 25,500
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $551,000
- Total Project Cost
- $826,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.