I-90 EB Jayne Adam over US 12-45

0.6 Mi E. Lee St. · County 031, Illinois · Built 2015 · 5 Lanes · 175,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
016961100000000
Year Built
2015
Length
39.2 m (128.6 ft)
Max Span
37.8 m
Width
28.4 m (93.2 ft)
Lanes
5
Daily Traffic
175,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.