Orchard Place over Willow Creek

250 ft N of IL 72 · County 031, Illinois · Built 2019 · 2 Lanes · 1,075 vehicles/day

Overall
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
016685000000000
Year Built
2019
Length
18.4 m (60.4 ft)
Max Span
8.8 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
1,075
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.