I-90 EB Jayne Adam over Higgins Road

0.5 Mi E. US 45 · County 031, Illinois · Built 2015 · 5 Lanes · 171,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016961300000000
Year Built
2015
Length
94.5 m (310 ft)
Max Span
38.7 m
Width
30.2 m (99.1 ft)
Lanes
5
Daily Traffic
171,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.