US 6 (159TH) over ALONG US 6 EB LANES

FROM I57 TO I294 · County 031, Illinois · Built 1962 · 4 Lanes · 25,100 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
016221500000000
Year Built
1962
Reconstructed
1963
Length
1394.5 m (4575.1 ft)
Max Span
3.5 m
Lanes
4
Daily Traffic
25,100
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.