I- 57NB RMP TO 294 over RAMP C & I-294

RAMP B · County 031, Illinois · Built 2014 · 2 Lanes · 15,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
016210000000000
Year Built
2014
Length
588.4 m (1930.4 ft)
Max Span
71.3 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
15,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.