I- 57 SB RMP T 294 over I-294 & I-57

RAMP C · County 031, Illinois · Built 2021 · 1 Lanes

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
016210100000000
Year Built
2021
Length
771.3 m (2530.5 ft)
Max Span
53.9 m
Width
9.7 m (31.8 ft)
Lanes
1
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.