IL 171 NB FIRST AV over S&S CANAL

0.2 M SE I-55 · County 031, Illinois · Built 1963 · 2 Lanes · 39,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
016048700000000
Year Built
1963
Reconstructed
2016
Length
242.2 m (794.6 ft)
Max Span
52.9 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
39,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,436,000
Total Project Cost
$5,154,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.