IL 171 SB FIRST AV over S&S CANAL

0.2 M SE I-55 · County 031, Illinois · Built 1963 · 2 Lanes · 39,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
016048600000000
Year Built
1963
Reconstructed
2015
Length
254 m (833.3 ft)
Max Span
52.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
39,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,855,000
Total Project Cost
$4,283,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.