IL 171 SB RMP I-55 over DES PLAINES RIVER

1.5 M SW IL 43 · County 031, Illinois · Built 1964 · 1 Lanes · 10,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
016102600000000
Year Built
1964
Reconstructed
2014
Length
209.6 m (687.7 ft)
Max Span
31.1 m
Width
8.9 m (29.2 ft)
Lanes
1
Daily Traffic
10,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,611,000
Total Project Cost
$2,417,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.