IL 171 NB ELEVATED over STA 53&15 TO 63&18

0.5 M SE JOLIET RD · County 031, Illinois · Built 1964 · 2 Lanes · 40,100 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
016245600000000
Year Built
1964
Reconstructed
2016
Length
294.4 m (965.9 ft)
Max Span
40.4 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
40,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,445,000
Total Project Cost
$6,668,000