IL 43 (HARLEM AVE over I- 55 STEVENSON

0.47 MI N OF ARCHER · County 031, Illinois · Built 1964 · 9 Lanes · 35,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
2
Critical
Substructure
5
Fair

Bridge Details

Structure #
016031600000000
Year Built
1964
Reconstructed
1990
Length
76.5 m (251 ft)
Max Span
25.6 m
Width
45.7 m (149.9 ft)
Lanes
9
Daily Traffic
35,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.