I- 55 EB STEVENSON over SAN & SHIP CANAL

0.9 M SW ILL 43 · County 031, Illinois · Built 1964 · 4 Lanes · 70,750 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
016001400000000
Year Built
1964
Reconstructed
2000
Length
213.1 m (699.1 ft)
Max Span
73.3 m
Width
22.9 m (75.1 ft)
Lanes
4
Daily Traffic
70,750
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,256,000
Total Project Cost
$5,373,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.