HARLEM AVE NB ILL over SAN & SHIP CANAL

0.1 M N I55 · County 031, Illinois · Built 1931 · 3 Lanes · 35,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
016031500000000
Year Built
1931
Reconstructed
1990
Length
139.1 m (456.4 ft)
Max Span
68.3 m
Width
22.2 m (72.8 ft)
Lanes
3
Daily Traffic
35,500
Material
Steel
Design
Movable - Bascule
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.