I- 57 SB over 143RD ST & RRS

6.5 M SW IL 1 · County 031, Illinois · Built 1967 · 3 Lanes · 54,850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
016005900000000
Year Built
1967
Reconstructed
2021
Length
280.2 m (919.3 ft)
Max Span
45 m
Width
26.1 m (85.6 ft)
Lanes
3
Daily Traffic
54,850
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,096,000
Total Project Cost
$6,144,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.