I- 57 NB over L.CAL.RIV.& THN.RD.

1.5 M NE ILL 83 · County 031, Illinois · Built 1966 · 3 Lanes · 54,850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
016006000000000
Year Built
1966
Reconstructed
2003
Length
316.6 m (1038.7 ft)
Max Span
38.1 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
54,850
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,193,000
Total Project Cost
$6,290,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.