I- 57 SB over DIXIE HWY

0.2 M NE IL 83 · County 031, Illinois · Built 1967 · 3 Lanes · 54,850 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016005700000000
Year Built
1967
Reconstructed
2021
Length
73.4 m (240.8 ft)
Max Span
42.4 m
Width
36.1 m (118.4 ft)
Lanes
3
Daily Traffic
54,850
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$831,000
Total Project Cost
$1,371,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.