FAS 1605(CH 11) over STREAM

IN ETNA · County 029, Illinois · Built 1988 · 2 Lanes · 600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
015331200000000
Year Built
1988
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
600
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.