FAS 1605(CH 11) over I-57
1.0 MI N CUMB CO LN · County 029, Illinois · Built 1964 · 2 Lanes · 625 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
39.388631, -88.406181
This bridge is in worse condition than 93% of bridges in County 029. The average bridge in Illinois is 0 years old; this one is 62 years old.
Nearby Bridges
FAS 1605(CH 11) over BUTTERMILK DITCH
Built 1980
FAS 1605(CH 11) over STREAM
Built 1988
TR 28 over Brush Creek
Built 2016
TR 46 over BUTTERMILK DITCH
Built 1982
TR 3 A-CUMB CO over BUTTERMILK DITCH
Built 1981
TR 36 over BUSH CREEK
Built 1916
US 45(FAP 824) over BUTTERMILK DITCH
Built 1975
TR 245(FAS 1667) over I-57
Built 1964
TR 22 over BRUSH CREEK
Built 1940
I-57 (NB) over BUSH CREEK
Built 1964
Bridge Details
- Structure #
- 015003700000000
- Year Built
- 1964
- Length
- 72.5 m (237.9 ft)
- Max Span
- 21.9 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 625
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $904,000
- Total Project Cost
- $1,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.