CH 31(FAS 674) over LITTLE WABASH RIVER
0.8MI S. PARADISE RD · County 029, Illinois · Built 1961 · 2 Lanes · 1,100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
39.397425, -88.443681
This bridge is in worse condition than 93% of bridges in County 029. The average bridge in Illinois is 0 years old; this one is 65 years old.
Nearby Bridges
CH 11 over LITTLE WABASH RIVER
Built 1978
FAS 674(CH 31) over LITTLE WABASH RIVER
Built 1938
TR 22 over BRUSH CREEK
Built 1940
FAS 1605(CH 11) over STREAM
Built 1988
TR 247 A over CLEAR CREEK
Built 1987
TR 28 over Brush Creek
Built 2016
TR 271 over CLEAR CREEK
Built 1991
TR 1 over Trib to Lake Mattoon
Built 2023
TR 183 over CLEAR CREEK
Built 2006
FAS 1605(CH 11) over I-57
Built 1964
Bridge Details
- Structure #
- 015003400000000
- Year Built
- 1961
- Length
- 39 m (128 ft)
- Max Span
- 13.8 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,100
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $495,000
- Total Project Cost
- $578,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.