TOWNSHIP ROAD 312 over BUREAU CREEK
4.5 M N MALDEN · County 011, Illinois · Built 1982 · 2 Lanes · 25 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 8 | Very Good |
Location
41.486625, -89.368747
This bridge is in worse condition than 41.7% of bridges in County 011. The average bridge in Illinois is 0 years old; this one is 44 years old.
Nearby Bridges
TOWNSHIP ROAD 99 over BUREAU CREEK
Built 1982
CH 27 over BUREAU CREEK
Built 1960
TR 302 over BR OF MASTERS CREEK
Built 1981
TR 312 over Masters Fork Branch
Built 1960
TR 300 over MASTERS CREEK
Built 1989
VAN ORIN RD / CH 2 over BUREAU CREEK
Built 1989
TOWNSHIP ROAD 97 over MASTERS CREEK
Built 1980
CH 12 over BUREAU CREEK
Built 1977
TOWNSHIP ROAD 74 over MASTERS CR.
Built 1965
TOWNSHIP ROAD 74 over BR BUREAU CR
Built 1962
Bridge Details
- Structure #
- 006402400000000
- Year Built
- 1982
- Length
- 30.2 m (99.1 ft)
- Max Span
- 12.2 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 25
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.