CH 27 over BUREAU CREEK

6.5 MI NE PRINCTON · County 011, Illinois · Built 1960 · 2 Lanes · 250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
006305200000000
Year Built
1960
Length
43.9 m (144 ft)
Max Span
15.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
250
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$194,000
Total Project Cost
$291,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.