TOWNSHIP ROAD 74 over BR BUREAU CR
5.5 MI. W. LAMOILLE · County 011, Illinois · Built 1962 · 2 Lanes · 125 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.524528, -89.383422
This bridge is in worse condition than 64.2% of bridges in County 011. The average bridge in Illinois is 0 years old; this one is 64 years old.
Nearby Bridges
TOWNSHIP ROAD 74 over BR BUREAU CREEK
Built 1940
TR 312 over Masters Fork
Built 1915
TR 312 over Masters Fork Branch
Built 1960
TOWNSHIP ROAD 74 over MASTERS CR.
Built 1965
TOWNSHIP ROAD 74 over MASTERS CREEK
Built 1961
TR 290 over MASTERS CREEK
Built 1998
TR 85 over MASTERS CREEK
Built 1965
TR 302 over BR OF MASTERS CREEK
Built 1981
IL 92 FAP 587 over BR. OF MASTERS CREEK
Built 1994
TOWNSHIP ROAD 99 over BUREAU CREEK
Built 1982
Bridge Details
- Structure #
- 006311400000000
- Year Built
- 1962
- Length
- 28 m (91.9 ft)
- Max Span
- 9.1 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 125
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.