I 90 EBL over SH 41

POST FALLS ECL · County 055, Idaho · Built 2023 · 2 Lanes · 32,250 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000016786-T
Year Built
2023
Length
44.7 m (146.7 ft)
Max Span
14.6 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
32,250
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.