I 90 EBL over SH 41
POST FALLS ECL · County 055, Idaho · Built 2023 · 2 Lanes · 32,250 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.71025, -116.895472
This bridge is in worse condition than 15.7% of bridges in County 055. The average bridge in Idaho is 0 years old; this one is 3 years old.
Nearby Bridges
I 90 WBL over SH 41;SH 41 IC
Built 1971
I 90 WBL over SH 41
Built 2024
I 90 WBL over I 90 EB ON RAMP
Built 2024
I 90 EBL over I 90 EB ON RAMP
Built 2023
I 90 WBL over SH 41
Built 2024
I 90 EBL over SH 41
Built 2023
I 90 WBL over I 90 EB OFF RAMP
Built 2024
I 90 EBL over I 90 EB OFF RAMP
Built 2023
S7525;GREENSFERRY over I 90 EB-WB;SCHNEIDMILLER
Built 2015
W HARBOR DRIVE over CHANNEL OF SPOKANE RIVER
Built 2000
Bridge Details
- Structure #
- 0000000016786-T
- Year Built
- 2023
- Length
- 44.7 m (146.7 ft)
- Max Span
- 14.6 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 32,250
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.