I 90 WBL over SH 41;SH 41 IC
1.7 E. POST FALLS · County 055, Idaho · Built 1971 · 3 Lanes · 32,250 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.710539, -116.895072
This bridge is in worse condition than 34.6% of bridges in County 055. The average bridge in Idaho is 0 years old; this one is 55 years old.
Nearby Bridges
I 90 WBL over SH 41
Built 2024
I 90 EBL over SH 41
Built 2023
I 90 WBL over I 90 EB ON RAMP
Built 2024
I 90 EBL over I 90 EB ON RAMP
Built 2023
I 90 WBL over SH 41
Built 2024
I 90 EBL over SH 41
Built 2023
I 90 WBL over I 90 EB OFF RAMP
Built 2024
I 90 EBL over I 90 EB OFF RAMP
Built 2023
S7525;GREENSFERRY over I 90 EB-WB;SCHNEIDMILLER
Built 2015
W HARBOR DRIVE over CHANNEL OF SPOKANE RIVER
Built 2000
Bridge Details
- Structure #
- 000000000016790
- Year Built
- 1971
- Length
- 39.6 m (129.9 ft)
- Max Span
- 14.6 m
- Width
- 14.1 m (46.3 ft)
- Lanes
- 3
- Daily Traffic
- 32,250
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,022,000
- Total Project Cost
- $1,533,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.