I 90 WBL over SH 41

POST FALLS ECL · County 055, Idaho · Built 2024 · 2 Lanes · 32,500 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000016791
Year Built
2024
Length
48.2 m (158.1 ft)
Max Span
47.2 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
32,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.