SILVERBERRY RD over BIG GULCH WASH #4

SPRING VALLEY DEV · County 001, Idaho · Built 2024 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
000000000034370
Year Built
2024
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
1,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.