STC3024;POLLARD LN over MIDDLETON CANAL
0.6 N. 1.3 E. STAR · County 001, Idaho · Built 1967 · 2 Lanes · 1,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.701614, -116.468281
This bridge is in worse condition than 89.1% of bridges in County 001. The average bridge in Idaho is 0 years old; this one is 59 years old.
Nearby Bridges
STC3761;PLUMMER RD over MIDDLETON CANAL
Built 1971
SH 16 over MIDDLETON CANAL
Built 1959
S3760;FLTG FEATHER over DRY CREEK CANAL
Built 1987
S3760;FLTG FEATHER over MIDDLETON CANAL
Built 1994
S3760;FLTG FEATHER over MIDDLETON CANAL
Built 1988
SH 16 over BOISE RIVER
Built 2014
S3760;FLTG FEATHER over MIDDLETON CANAL
Built 1966
STC 3767;MUNGER RD over MIDDLETON CANAL
Built 1965
STC 3770;STAR RD over BOISE RIVER(STAR BRIDGE)
Built 1982
SH 16 over W.JOPLIN CT;EUREKA CANAL
Built 2014
Bridge Details
- Structure #
- 000000000026315
- Year Built
- 1967
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.3 m
- Width
- 6.6 m (21.7 ft)
- Lanes
- 2
- Daily Traffic
- 1,300
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $208,000
- Total Project Cost
- $312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.