S3760;FLTG FEATHER over MIDDLETON CANAL
1.0 N. 0.5 W. STAR · County 001, Idaho · Built 1966 · 2 Lanes · 3,600 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
43.706628, -116.501258
This bridge is in worse condition than 13.2% of bridges in County 001. The average bridge in Idaho is 0 years old; this one is 60 years old.
Nearby Bridges
STC 3767;MUNGER RD over MIDDLETON CANAL
Built 1965
S3760;FLTG FEATHER over MIDDLETON CANAL
Built 1988
S3760;FLTG FEATHER over MIDDLETON CANAL
Built 1994
S3760;FLTG FEATHER over DRY CREEK CANAL
Built 1987
STC3761;PLUMMER RD over MIDDLETON CANAL
Built 1971
STC3024;POLLARD LN over MIDDLETON CANAL
Built 1967
STC 3770;STAR RD over BOISE RIVER(STAR BRIDGE)
Built 1982
SH 16 over MIDDLETON CANAL
Built 1959
SH 16 over BOISE RIVER
Built 2014
STC 3770;STAR RD over PHYLLIS CANAL
Built 1967
Bridge Details
- Structure #
- 000000000025960
- Year Built
- 1966
- Reconstructed
- 1993
- Length
- 9.4 m (30.8 ft)
- Max Span
- 9.1 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 3,600
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $412,000
- Total Project Cost
- $618,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.