HANLEY PLACE over WILLOW CREEK

6.95 S. EMMETT · County 001, Idaho · Built 2023 · 2 Lanes · 40 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000034285
Year Built
2023
Length
21 m (68.9 ft)
Max Span
19.8 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
40
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.