ALPINE STEET over ELEC LGHT SWITCH LATERAL
IN BOISE · County 001, Idaho · Built 1970 · 2 Lanes · 730 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
43.604306, -116.226028
This bridge is in worse condition than 89.1% of bridges in County 001. The average bridge in Idaho is 0 years old; this one is 56 years old.
Nearby Bridges
OWYHEE STREET over RIDENBAUGH CANAL
Built 1992
SMA 7273;LATAH ST over RIDENBAUGH CANAL
Built 1991
SHOSHONE STREET over RIDENBAUGH CANAL
Built 1989
STC 7233;ROOSEVELT over RIDENBAUGH CANAL
Built 1990
NHS 7433;VISTA AVE over RIDENBAUGH CANAL
Built 1947
SMA 7363;AMERICANA over SETTLERS CANAL
Built 1993
STP 7363;AMERICANA over BOISE RIVER
Built 1994
NHS 7183;9TH ST over BOISE RIVER
Built 1987
SMA7553;FEDERAL WY over RIDENBAUGH CANAL
Built 1991
NHS 7553;CAPITOL over BOISE RIVER
Built 1931
Bridge Details
- Structure #
- 000000000033440
- Year Built
- 1970
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.6 m
- Width
- 11.5 m (37.7 ft)
- Lanes
- 2
- Daily Traffic
- 730
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $386,000
- Total Project Cost
- $579,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.