NHS 7183;9TH ST over BOISE RIVER
IN BOISE;S. 9TH STREET · County 001, Idaho · Built 1987 · 4 Lanes · 15,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.609464, -116.209442
This bridge is in worse condition than 47.4% of bridges in County 001. The average bridge in Idaho is 0 years old; this one is 39 years old.
Nearby Bridges
NHS 7553;CAPITOL over BOISE RIVER
Built 1931
SMA 9793; MAIN ST over BOISE VRT CENTER
Built 2016
US 20 EBL over AMERICANA BLVD;15TH ST.
Built 1992
US 20 WBL over AMERICANA BLVD;15TH ST.
Built 1992
STP 7363;AMERICANA over BOISE RIVER
Built 1994
SMA 7363;AMERICANA over SETTLERS CANAL
Built 1993
SHOSHONE STREET over RIDENBAUGH CANAL
Built 1989
NHS 7433;VISTA AVE over RIDENBAUGH CANAL
Built 1947
SMA7553;FEDERAL WY over RIDENBAUGH CANAL
Built 1991
ALPINE STEET over ELEC LGHT SWITCH LATERAL
Built 1970
Bridge Details
- Structure #
- 000000000021655
- Year Built
- 1987
- Length
- 94.8 m (311 ft)
- Max Span
- 44.2 m
- Width
- 19.6 m (64.3 ft)
- Lanes
- 4
- Daily Traffic
- 15,500
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,246,000
- Total Project Cost
- $1,371,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.