NHS 7553;CAPITOL over BOISE RIVER
IN BOISE;CAPITOL BLVD · County 001, Idaho · Built 1931 · 3 Lanes · 16,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.608847, -116.208222
This bridge is in worse condition than 47.4% of bridges in County 001. The average bridge in Idaho is 0 years old; this one is 95 years old.
Nearby Bridges
NHS 7183;9TH ST over BOISE RIVER
Built 1987
SMA 9793; MAIN ST over BOISE VRT CENTER
Built 2016
US 20 EBL over AMERICANA BLVD;15TH ST.
Built 1992
NHS 7433;VISTA AVE over RIDENBAUGH CANAL
Built 1947
US 20 WBL over AMERICANA BLVD;15TH ST.
Built 1992
SHOSHONE STREET over RIDENBAUGH CANAL
Built 1989
SMA7553;FEDERAL WY over RIDENBAUGH CANAL
Built 1991
STP 7363;AMERICANA over BOISE RIVER
Built 1994
US 20; I 84B over BOISE RIVER;BROADWAY BR
Built 2016
SMA 7363;AMERICANA over SETTLERS CANAL
Built 1993
Bridge Details
- Structure #
- 000000000021445
- Year Built
- 1931
- Reconstructed
- 1992
- Length
- 92.4 m (303.1 ft)
- Max Span
- 23.2 m
- Width
- 19.3 m (63.3 ft)
- Lanes
- 3
- Daily Traffic
- 16,500
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,478,000
- Total Project Cost
- $5,217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.