E 200 N over BURGESS CANAL
1.1 S. 3.6 W. RIGBY · County 051, Idaho · Built 1970 · 2 Lanes · 480 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.655378, -111.989369
This bridge is in worse condition than 20% of bridges in County 051. The average bridge in Idaho is 0 years old; this one is 56 years old.
Nearby Bridges
N 3600 E RD over BURGESS CANAL
Built 1967
3700 EAST RD over BURGESS CANAL
Built 1960
E 100 N RD over BURGESS CANAL
Built 1970
STC6715(N 3400 E) over BURGESS CANAL
Built 1960
N 3800 E RD(OLSON) over BURGESS CNL;W.RIGBY BR
Built 1974
US 20 WBL over COUNTY LINE ROAD IC
Built 2001
US 20 EBL over COUNTY LINE ROAD IC
Built 2001
STC6731;W 145 N over BURGESS CANAL
Built 1961
E 200 N over FAIRVIEW CANAL
Built 1974
N 3900 E; IONA RD over BURGESS CNL; SW RIGBY BR
Built 2013
Bridge Details
- Structure #
- 000000000032550
- Year Built
- 1970
- Length
- 12.2 m (40 ft)
- Max Span
- 11.9 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 480
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $353,000
- Total Project Cost
- $530,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.