STC6731;W 145 N over BURGESS CANAL
9.3 N. 0.9 W. IDAHO FALLS · County 051, Idaho · Built 1961 · 2 Lanes · 2,800 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.626306, -112.039506
This bridge is in worse condition than 1.6% of bridges in County 051. The average bridge in Idaho is 0 years old; this one is 65 years old.
Nearby Bridges
N 5TH W over BURGESS CANAL
Built 1962
STC6731;W 145 N over IDAHO CANAL
Built 1967
STC6715(N 3400 E) over BURGESS CANAL
Built 1960
E 100 N RD over BURGESS CANAL
Built 1970
STC6731;W 145 N over SNAKE RIVER
Built 1967
STC6731;W 145 N over GREAT WESTERN CANAL
Built 1967
I 15 NBL over STC 6731;W 145 N IC
Built 1962
I 15 SBL over STC 6731;W 145 N IC
Built 1962
N 26TH W over OSGOOD CANAL
Built 1928
W 113 N over I 15;W 113 N GS
Built 1962
Bridge Details
- Structure #
- 000000000020885
- Year Built
- 1961
- Length
- 6.4 m (21 ft)
- Max Span
- 6.4 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,800
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $312,000
- Total Project Cost
- $468,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.