3700 EAST RD over BURGESS CANAL
0.8 S. 2.4 W. RIGBY · County 051, Idaho · Built 1960 · 2 Lanes · 1,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.659397, -111.963789
This bridge is in worse condition than 20% of bridges in County 051. The average bridge in Idaho is 0 years old; this one is 66 years old.
Nearby Bridges
N 3600 E RD over BURGESS CANAL
Built 1967
N 3800 E RD(OLSON) over BURGESS CNL;W.RIGBY BR
Built 1974
E 200 N over BURGESS CANAL
Built 1970
E 200 N over FAIRVIEW CANAL
Built 1974
N 3900 E; IONA RD over BURGESS CNL; SW RIGBY BR
Built 2013
US 20B over US 20 NB-SB;S.RIGBY IC
Built 1976
OLD YELLOWSTONE HW over BURGESS CANAL
Built 1940
US 20B over BURGESS CANAL
Built 1972
US 20 WBL over COUNTY LINE ROAD IC
Built 2001
US 20 EBL over COUNTY LINE ROAD IC
Built 2001
Bridge Details
- Structure #
- 000000000032500
- Year Built
- 1960
- Length
- 17.1 m (56.1 ft)
- Max Span
- 8.2 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,100
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $554,000
- Total Project Cost
- $831,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.