N 4950 E over DRY BED SNAKE RIVER

1.0 N. 3.1 E. RIRIE · County 051, Idaho · Built 1968 · 2 Lanes · 560 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000032460
Year Built
1968
Length
37.8 m (124 ft)
Max Span
18.9 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
560
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$870,000
Total Project Cost
$1,305,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.