NORTH 4825 EAST over ENTERPRISE CANAL
0.8 N. 1.8 E. RIRIE · County 051, Idaho · Built 1970 · 2 Lanes · 80 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.637433, -111.750633
This bridge is in worse condition than 20% of bridges in County 051. The average bridge in Idaho is 0 years old; this one is 56 years old.
Nearby Bridges
NORTH 4850 EAST RD over ANDERSON CANAL
Built 1974
STC 6768;N 4700 E over FARMERS FRIEND CANAL
Built 1950
STC 6768;N 4700 E over HARRISON CANAL
Built 1982
NORTH 4850 EAST RD over EAGLE ROCK CANAL
Built 1974
2ND EAST STREET over EAGLE ROCK CANAL
Built 1968
2ND EAST STREET over ANDERSON CANAL
Built 1968
STC6859;E RIRIE HY over ANDERSON CANAL
Built 2015
STC 6768;4700 EAST over DRY BED CANAL
Built 1965
STC6859;E RIRIE HY over EAGLE ROCK CANAL
Built 2015
US 26 over EAGLE ROCK CANAL
Built 1969
Bridge Details
- Structure #
- 000000000032255
- Year Built
- 1970
- Length
- 8.5 m (27.9 ft)
- Max Span
- 7.9 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 80
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $194,000
- Total Project Cost
- $291,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.