STC6859;E RIRIE HY over ANDERSON CANAL

AT RIRIE · County 019, Idaho · Built 2015 · 2 Lanes · 630 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000021151
Year Built
2015
Length
15.2 m (49.9 ft)
Max Span
7.3 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
630
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.