2ND EAST STREET over ANDERSON CANAL

IN RIRIE;2ND E.ST · County 051, Idaho · Built 1968 · 2 Lanes · 180 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000032485
Year Built
1968
Length
7.3 m (24 ft)
Max Span
7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
180
Material
Prestressed Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$166,000
Total Project Cost
$249,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.