175TH E./POPLAR RD over ANDERSON CANAL

0.3 S. 4.5 E. RIRIE · County 019, Idaho · Built 1971 · 2 Lanes · 160 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000031130
Year Built
1971
Length
11.9 m (39 ft)
Max Span
11.3 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
160
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.