STC 5711;MOON PASS over SQUAW CREEK

3.5 N. 1.6 E. AVERY · County 079, Idaho · Built 1909 · 1 Lanes · 370 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000030920
Year Built
1909
Reconstructed
1989
Length
157.6 m (517.1 ft)
Max Span
27.3 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
370
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,713,000
Total Project Cost
$4,070,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.