STC 5711;MOON PASS over BULLION CREEK
8.7 N. 1.9 E. AVERY · County 079, Idaho · Built 1937 · 1 Lanes · 220 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
47.377192, -115.764294
This bridge is in worse condition than 65.5% of bridges in County 079. The average bridge in Idaho is 0 years old; this one is 89 years old.
Nearby Bridges
STC 5711;MOON PASS over LOOP CREEK
Built 1990
STC 5711;MOON PASS over CHAMPION CREEK
Built 1949
FS ROUTE NO. 456A over N.F. ST JOE RIVER
Built 1935
STC 5711;MOON PASS over BIG DICK CREEK
Built 1909
FS ROUTE NO. 1997 over RYE CREEK
Built 1949
FS ROUTE 326 over FRAZIER CREEK
Built 1938
FS ROUTE NO. 326 over CLIFF CREEK
Built 2010
FS ROUTE NO. 300A over N.F. ST JOE RIVER
Built 1935
RD 506 over ST REGIS RIVER
Built 1954
FS ROUTE NO. 300A over SQ___ CREEK
Built 1938
Bridge Details
- Structure #
- 000000000020415
- Year Built
- 1937
- Length
- 10.4 m (34.1 ft)
- Max Span
- 10.1 m
- Width
- 6.7 m (22 ft)
- Lanes
- 1
- Daily Traffic
- 220
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $408,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.