STC 5711;MOON PASS over LOOP CREEK
7.1 N. 3.3 E. AVERY · County 079, Idaho · Built 1990 · 1 Lanes · 370 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.352969, -115.736519
This bridge is in worse condition than 24.5% of bridges in County 079. The average bridge in Idaho is 0 years old; this one is 36 years old.
Nearby Bridges
FS ROUTE NO. 456A over N.F. ST JOE RIVER
Built 1935
STC 5711;MOON PASS over BIG DICK CREEK
Built 1909
FS ROUTE NO. 1997 over RYE CREEK
Built 1949
FS ROUTE 326 over FRAZIER CREEK
Built 1938
STC 5711;MOON PASS over BULLION CREEK
Built 1937
FS ROUTE NO. 326 over CLIFF CREEK
Built 2010
FS ROUTE NO. 300A over N.F. ST JOE RIVER
Built 1935
FS ROUTE NO. 300A over SQ___ CREEK
Built 1938
STC 5711;MOON PASS over SQUAW CREEK
Built 1909
STC 5711;MOON PASS over CHAMPION CREEK
Built 1949
Bridge Details
- Structure #
- 000000000020409
- Year Built
- 1990
- Length
- 18.3 m (60 ft)
- Max Span
- 17.7 m
- Width
- 5.4 m (17.7 ft)
- Lanes
- 1
- Daily Traffic
- 370
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $416,000
- Total Project Cost
- $624,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.